Cooling overheating reactor using compressed gas to propel liquid to reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9966154
SERIAL NO

15657127

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A passive safety system for a nuclear power plant (100) cools the plant after shutdown, even when primary water circulation is disabled. The system comprises a source of compressed gas (112, 805) which can be the system's only source of operating energy, a source of external cooling water (106, 500), and interconnection components. If the reactor overheats, the gas is used to force the cooling water into the reactor's core. The gas can be taken from a highly compressed source and decompressed to a lower pressure suitable for forcing the water from the source, in which case the water can first be used to supply heat to the expanding gas to prevent it from freezing its environment. The system can be located underground or can be portable, e.g., carried on railroad cars or other wheeled conveyances. The system can be located above ground, or in a covered trench (705).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WATTENBURG WILLARD HARVEYCHICO CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wattenburg, Willard Harvey Chico, US 5 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00