Using sense amplifier as a write booster in memory operating with a large dual rail voltage supply differential

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9966131
SERIAL NO

14832968

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A memory includes a memory cell that operates in response to an array supply voltage, and a corresponding pair of bit lines that are pre-charged to a periphery supply voltage prior to each access of the memory cell. A sense amplifier coupled to the bit lines operates in response to the periphery supply voltage. The periphery supply voltage is less than the array supply voltage to enable power savings within the memory. A first pair of transistors is configured to couple the sense amplifier to the bit lines during write accesses to the memory cell, thereby boosting the write voltages applied to the bit lines during a write operation. That is, the first pair of transistors is configured such that the sense amplifier pulls one of the bit lines toward the periphery supply voltage (and the other one of the bit lines toward the ground supply voltage) during write accesses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYNOPSYS INCMOUNTAIN VIEW CA 94043-4033

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Behera, Niranjan Newark, US 14 119
Sonkar, Dharmesh Kumar Sunnyvale, US 4 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00