Optimized decision-making system and method for multiple ore dressing production indexes based on cloud server and mobile terminals

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9965722
SERIAL NO

15107013

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is an optimized decision-making system for multiple ore dressing production indexes based on a cloud server and mobile terminals, including mobile intelligent terminals, a cloud server, a mobile industrial private cloud server, a collecting computer and process controllers PLC or DCS. The mobile industrial private cloud server calculates out multiple decision-making result solution sets; the intelligent mobile terminals determine the final decision-making results; the mobile industrial private cloud server calculates out process control set values; the mobile intelligent terminals determine the final process control set values; and the process controllers PLC or DCS control equipment on a production line for production according to the final process control set values. The present invention further provides an optimized decision-making method for multiple ore dressing production indexes adopting the optimized decision-making system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORTHEASTERN UNIVERSITY110819 NO 3 LANE HEPING ROAD HEPING DISTRICT SHENYANG LIAONING 11 SHENYANG CITY LIAONING PROVINCE 110819

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chai, Tianyou Shenyang, CN 9 7
Ding, Jinliang Shenyang, CN 7 14
Gao, Lun Shenyang, CN 2 6
Liu, Changxin Shenyang, CN 10 156

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00