Power supply failover system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9965365
SERIAL NO

15004585

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply failover system/method providing uninterruptable power to protected load devices (PLD) is disclosed. The system includes a failover switch controller (FSC) with inputs from an AC I/V monitor (AIV), AC cycle counter (ACC), failover switch timer (FST), and overcurrent protection timer (OPT). The FSC utilizes these inputs to control failsafe switching of a bypass phase switch (BPS) and AC phase switch (ACS) to the PLD when power from the APS is determined to be good by the AIV. When power from the APS is determined to be compromised by the AIV, the FPS disables the ACS/BPS and enables a DC switch (DCS) and battery isolation switch (BIS) to connect a DC source to the PLD after a time period determined by the FST. APS/DCS overcurrent protection is limited by OPT intervals allowing a smooth transition between the APS to DCS during power failover/failback.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LITE-ON INCMILPITAS CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiang, Chih Hung New Taipei, TW 6 8
Lee, Victor K J Dallas, US 8 66
Liang, Wei Kang New Taipei, TW 1 3
Liu, Yung Hsiang New Taipei, TW 5 41
Wang, Yu Kai New Taipei, TW 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00