Switchgear controller device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9965013
SERIAL NO

14219976

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power distribution system that distributes power to electrical loads includes a switchgear apparatus that selectively routes power from one of two or more feeds to downstream portions of the system based upon commands received from a separate external switchgear controller device that receives data from various portions of the power distribution system. The switchgear controller device can operate in one or more separate operating modes, where commands to the switchgear apparatus are generated based upon user inputs or determinations made by an internal switchgear control module based at least in part upon the selected operating mode of the switchgear controller device. The operating mode can be set based upon user interaction with an operating mode interface. The switchgear control module may generate switchgear operation commands based at least in part upon data received from the switchgear apparatus and various portions of the power distribution system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMAZON TECHNOLOGIES INCRENO NV 89507

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hughes, Patrick Enfield, IE 40 749
McGee, Nigel Martin Ashburn, US 5 30
O'Grady, Martin John Castleblayney, IE 2 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00