Time measuring circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9964928
SERIAL NO

14817271

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first encoding part encodes a reference timing determined by a reference clock by using a delay line. A second encoding part encodes a measurement start timing and a measurement end timing of a measurement period determined by a measurement signal to be measured by also using the delay line. A count part counts the reference clocks included in the measurement period. A fraction calculation part calculates a start fraction number indicating a time difference from the measurement start timing and an immediately-following reference timing and an end fraction number indicating a time difference from the measurement end timing to an immediately-following reference timing, based on the encoding result. The fraction calculation part then calculates a fraction data indicating a difference between the measurement period and a product of the period of the reference timing and the count value of the count part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Taguchi, Nobuyuki Nagoya, JP 55 1877
Watanabe, Takamoto Nagoya, JP 85 1338
Yamauchi, Shigenori Nisshin, JP 32 657

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00