3D thermoplastic composite pultrusion system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9963978
SERIAL NO

14967784

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A 3D thermoplastic pultrusion system, comprises one or more sets of 3D thermoplastic forming machines; a CNC control system controlling the one or more sets of 3D thermoplastic forming machines to form a heated prepreg thermoplastic composite material into a 3D thermoplastic composite pultrusion, the one or more sets of 3D thermoplastic forming machines include a plurality of motion control CNC rotational motors and CNC actuators operatively coupled to the motion control CNC rotational motors, a flexible chilled band shapeable by the CNC actuators to form the heated prepreg thermoplastic composite material into the thermoplastic composite pultrusion, and bearings that the motion control CNC rotational motors pivot the actuators about and hold the actuators in position during a consolidation process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EBERT COMPOSITES CORPORATIONCHULA VISTA CA 91911

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Garrett, Scott A San Diego, US 32 1208
Johnson, David W San Diego, US 125 2832
Moyers, Stephen G Jamul, US 29 1064

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00