Rail vehicle comprising snow plow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9963845
SERIAL NO

15122211

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rail vehicle has a vehicle body supported in a sprung fashion on bogies. A snow plow has two blade plates that run to a point and a plow blade arranged vertically adjustably behind the blade plates. A projecting portion of the plow blade that projects downwards beyond a lower edge of the blade plates is adjustable. The blade plates rest with their lower edge on a base plate which forms a cutting edge that protrudes from the lower edge in the direction of travel. The snow plow is attached to an under frame of the vehicle body such that the base plate maintains a safety distance from the travel rails. The safety distance is predefined by a maximum spring compression of the vehicle body. The protruding portion of the plow blade is set as a function of the safety distance and of a wear of the wheels of the bogies.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS MOBILITY GMBHOTTO-HAHN-RING 6 81739 MÜNCHEN 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fege, Alexander Augsburg, DE 4 0
Melde, Joerg Olching, DE 2 0
Meyer, Joachim Munich, DE 35 115
Pforr, Joerg Moosach, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00