Knit EMI shield and method of construction thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9963808
SERIAL NO

14643638

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electromagnetic interference (EMI) shield assembly and method of construction is provided. The assembly includes a body having a wall of warp knit nonmetallic yarn having opposite sides extending generally parallel with one another between opposite ends and a plurality of weft inserted metal wires. The wire is inserted to provide discrete bundles each arranged in side-by-side relation with one another and extending beyond the opposite sides of the wall to provide a plurality of exposed free ends. The nonmetallic yarn is looped about the wires, thereby fixing the wire relative to the nonmetallic yarn and to other wires in an optimal EMI shielding position. Metal brackets adapted for ready attachment to a source of electrical ground are attached to the exposed free ends. The individual bundles of wires extend parallel to one another, with a gap having a predetermined width extending between the adjacent bundles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FEDERAL-MOGUL POWERTRAIN LLC15701 TECHNOLOGY DRIVE NORTHVILLE MI 48168

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamaguchi, Hiroki Kanagawa, JP 140 609

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00