Method for recovering process wastewater from a steam power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9962664
SERIAL NO

14430680

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for operating a steam power plant having a water-steam circuit, according to which method the process wastewater produced is collected from the water-steam circuit, in a separated manner according to the degree of contamination thereof, in a number of partial wastewater quantities is provided. At least a first partial wastewater quantity having a first degree of contamination and at least a second partial wastewater quantity having a second degree of contamination are formed in the process. The second degree of contamination is higher than the first degree of contamination. The first partial wastewater quantity and the second partial wastewater quantity are mixed together in such a manner that a combined process wastewater is produced, which is fed to a wastewater treatment plant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGOTTO-HAHN-RING 6 MÜNCHEN 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amslinger, Ute Auhausen, DE 2 2
Fleischmann, Franziska Nürnberg, DE 1 2
Glück, Wolfgang Erlangen, DE 2 0
Söllner, Anke Bubenreuth, DE 3 3
Sattelberger, Marc Nürnberg, DE 5 15
Spies, Werner Mühlhausen, DE 2 2
Widmann, Peter Dormitz, DE 5 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00