Stacked PA power control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9960737
SERIAL NO

15451184

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems, methods and apparatus for efficient power control of an RF amplifier for amplification of a constant envelope RF signal are described. A reduction in a size of a pass device of an LDO regulator is obtained by removing the pass device of the LDO regulator from a main current conduction path of the RF amplifier. Power control is provided by varying one or more gate voltages to cascoded transistors of a transistor stack of the RF amplifier according to a power control voltage. Various configurations for controlling the gate voltages are presented by way of a smaller size LDO regulator or by completely removing the LDO regulator. In a case where a supply voltage to the transistor stack varies, such as in a case of a battery, a compensation circuit is used to adjust the power control voltage in view of a variation of the supply voltage, and therefore null a corresponding drift in output power of the RF amplifier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PSEMI CORPORATION9369 CARROLL PARK DRIVE SAN DIEGO CA 92121

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kovac, David Arlington Heights, US 60 923

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00