Electrode separator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9960399
SERIAL NO

14477219

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-functional battery separator comprises two or more active separator layers deposited from different polymer solutions to form a multilayered unitary structure comprising a free-standing film, a multiplex film on one side of a porous substrate, or separate films or multiplex films on opposite sides of a porous substrate. In a preferred embodiment, the cascade coating method is used to simultaneously deposit the active separator layers wet so that the physical, electrical and morphological changes associated with the polymer drying out process are avoided or minimized. The multi-functional separator is inexpensive to fabricate, exhibits enhanced ionic conductivity and ionic barrier properties, and eliminates gaps between individual layers in a separator stack that can contribute to battery failure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RIOT ENERGY INC4765 CALLE QUETZAL CAMARILLO CA 93012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adamson, George Princeton Junction, US 16 156
Duong, Hieu Rosemead, US 5 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00