Heat exchanger and dynamic baffle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9958219
SERIAL NO

14946962

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat exchanger includes tubes having tube inlets, an inlet tank having therein an inlet tank space, and a dynamic baffle disposed in the inlet tank space. The inlet tank has a tank inlet. The tubes include first tubes and second tubes. The first tubes are closer to the tank inlet than the second tubes are to the tank inlet. The first tubes include a nearest tube that is, among the tubes, closest to the tank inlet. The dynamic baffle is configured to, when the fluid pressure of the thermal fluid in the inlet tank space is below a specified value, suppress the flow rates of the plurality of first tubes, and, when the fluid pressure of the thermal fluid in the inlet tank space is at or above the specified value, increase the flow rate of at least one of the plurality of the first tubes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO INTERNATIONAL AMERICA INCSOUTHFIELD MICHIGAN 48086

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gosioco, Delomer Royal Oak, US 10 40
Korenchuk, David Royal Oak, US 9 24
Westergaard, Shawn Sterling Heights, US 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00