Hybrid drive shaft using friction-stir welding and fabrication method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9958003
SERIAL NO

14654743

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a hybrid drive shaft using friction-stir welding and a fabrication method thereof, and more particularly to a drive shaft comprising a metal tube, a composite material layer formed inside the metal tube, and a metal yoke connected to both ends of the drive shaft by means of friction-stir welding so as to make the components simple and lightweight and to enhance the durability, and a fabrication method thereof. The fabrication method comprises the steps of: shaping a composite material sheet; bonding the cylindrical composite material layer to the inside of a metal tube; maintaining the inside of the metal tube in a vacuum state for a given duration; heating the metal tube maintained in the vacuum state in an autoclave; and adjoining a connection member for connecting other parts to the ends of the metal tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WOO SHIN EMC CO LTDGYEONGGI-DO 429-850

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Dong Ho Seoul, KR 120 523

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00