Methods and systems for enhancing control of power plant generating units

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9957843
SERIAL NO

14555196

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control method for optimizing a turndown operation for a power plant having a plurality of generating units. The plurality of generating units each may include either an on-condition or an off-condition during a selected operating period. The method may include: defining competing operating modes, wherein the competing operating modes include different possible combinations regarding which of the plurality of generating units have the on-condition and which have the off-condition during the selected operating period; defining multiple cases for each of the competing operating modes, wherein the multiple cases include varying a value of an operating parameter; receiving performance objectives that include a cost function; receiving an ambient conditions forecast; for the multiple cases of the competing operating modes, simulating the turndown operation with a power plant model given the value of the operating parameter and the ambient conditions forecast; evaluating a simulation result pursuant to the cost function so to select therefrom a preferred case.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Raczynski, Chrstopher Michael Marietta, US 1 40
Wichmann, Lisa Anne Marietta, US 30 2266

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00