Mechanisms for lowering a payload to the ground from a UAV

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9957046
SERIAL NO

15711758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments described herein may help to provide medical support via a fleet of unmanned aerial vehicles (UAVs). An illustrative UAV may include a housing, a payload, a line-deployment mechanism coupled to the housing and a line, and a payload-release mechanism that couples the line to the payload, wherein the payload-release mechanism is configured to release the payload from the line. The UAV may further include a control system configured to determine that the UAV is located at or near a delivery location and responsively: operate the line-deployment mechanism according to a variable deployment-rate profile to lower the payload to or near to the ground, determine that the payload is touching or is within a threshold distance from the ground, and responsively operate the payload-release mechanism to release the payload from the line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WING AVIATION LLC3400 HILLVIEW AVENUE BUILDING 4 PALO ALTO CA 94304

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burgess, James Ryan Redwood City, US 22 1555
Conrad, Andrew Malibu, US 30 793
Patrick, William Graham Palo Alto, US 32 2123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00