Method for controlling a hybrid driveline in order to optimize torque from a combustion engine arranged at the driveline

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9956952
SERIAL NO

15124831

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided to control a hybrid powertrain that comprises: a combustion engine; a gearbox with input and output shafts; a first planetary gear connected to the input shaft and a first main shaft; a second planetary gear, connected to the first planetary gear and a second main shaft; first and second electrical machines, respectively connected to the first and second planetary gears; one gear pair connected with the first planetary gear and output shaft; and one gear pair connected with the second planetary gear and output shaft. The method comprises: disconnecting a first planetary wheel carrier and a first sun wheel or disconnecting a second planetary wheel carrier and a second sun wheel from each other; b) controlling the combustion engine to a predetermined engine speed; and c) controlling the first and second electrical machines so that a desired torque is achieved in the output shaft, while a requested total power consumption of the first and the second electrical machines is achieved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCANIA CV ABSWEDISH SODERTALJE SODERTALJE STOCKHOLM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergquist, Mikael Huddinge, SE 65 469
Björkman, Mathias Tullinge, SE 62 384
Lindström, Johan Nyköping, SE 106 586
Pettersson, Niklas Stockholm, SE 129 1411

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00