Shoelace structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9955754
SERIAL NO

15057202

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shoelace structure includes an outer sleeve, a liner mounted in the outer sleeve, and an inner core mounted in the liner. The inner core includes a first weaving thread and a plurality of second weaving threads. The first weaving thread interweaves and intertwines with the second weaving threads, with the second weaving threads being secured to the first weaving thread, thereby defining a plurality of enlarged portions and a plurality of separation portions. The liner is squeezed by the enlarged portions of the inner core and defines a plurality of expanded sections and a plurality of recessed sections. The expanded sections of the liner respectively corresponds to the enlarged portions of the inner core, and the recessed sections of the liner respectively corresponds to the separation portions of the inner core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KAE SHENG INDUSTRIAL CO LTDNO 32 LN 129 SEC 3 DINGCAO RD LUGANG TOWNSHIP CHANGHUA COUNTY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Tsai-Chen Lugang Township, TW 5 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00