Voltage control device with gate capacitor charging and discharging

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9954460
SERIAL NO

15288606

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A voltage control device includes an output module and a control module. The output module provides an output current at an output terminal thereof based on a control voltage. The control module includes a comparing circuit, a capacitor, a charging circuit and a discharging circuit. The comparing circuit compares a to-be-compared voltage, which is associated at least with a to-be-controlled voltage at the output terminal of the output module, with a predetermined reference voltage to generate a comparison signal. The capacitor provides the control voltage. The charging circuit is operable to charge the capacitor based on the comparison signal. The discharging circuit is operable to discharge the capacitor based on the comparison signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MACROBLOCK INCHSINCHU CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Che-Wei Hsinchu, TW 202 784
Chang, Lon-Kou Hsinchu, TW 9 119
Chiang, Ting-Ta Hsinchu, TW 8 31
Liao, Shi-Jie Hsinchu, TW 1 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00