t trip characteristic

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9954351
SERIAL NO

14923372

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a protection circuit configured to indicate an overcurrent condition of a conductor conducting a load current, the protection circuit including a first current integrator and a second current integrator, each of the first and second integrators being configured to integrate an input voltage proportional to the load current, a summing amplifier configured to receive an offset voltage, to amplify a signal from the second integrator, and to generate a trip threshold based on the input voltage and the offset voltage, and a comparator configured to compare an output of the first current integrator and the trip threshold, and to generate a trip signal at a trip time when the trip threshold is equal to an output of the first integrator, the trip signal indicating an overcurrent condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOLDMAN SACHS BANK USA AS SUCCESSOR COLLATERAL AGENT200 WEST STREET NEW YORK NY 10282

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Khan, Imtiaz Trabuco Canyon, US 11 75
Tran, Anhtai Le Santa Ana, US 5 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00