Connector and method of connecting connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9954299
SERIAL NO

13855154

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector configured to make a contact with an electrical apparatus includes a contact formed of a metal material; and a housing that houses the contact. The contact includes an exposed part that is exposed outside the housing, a contact portion provided in the exposed part and configured to come into contact with an electrode of the electrical apparatus, and a projecting part provided in the exposed part and positioned between the contact portion and the housing. The housing includes an exterior wall that forms a surface of the housing that faces the electrode. The exterior wall and the projecting part are configured to be in contact with each other when the electrode and the contact portion come into contact with each other to establish an electrical connection between the contact and the electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJITSU COMPONENT LIMITEDTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beak, SeungSeok Tokyo, JP 16 51
Kiryu, Koichi Nagano, JP 60 1689

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00