System and method for an oxidant heating system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9951658
APP PUB NO 20150033748A1
SERIAL NO

14314601

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes an oxidant compressor and a gas turbine engine. The gas turbine engine includes a combustor section having a turbine combustor, a turbine driven by combustion products from the turbine combustor, and an exhaust gas compressor driven by the turbine. The exhaust gas compressor is configured to compress and route an exhaust flow to the turbine combustor and the oxidant compressor is configured to compress and route an oxidant flow to the turbine combustor. The gas turbine engine also includes an inlet oxidant heating system configured to route at least one of a first portion of the combustion products, or a second portion of the exhaust flow, or any combination thereof, to an inlet of the oxidant compressor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345
EXXONMOBIL UPSTREAM RESEARCH COMPANY22777 SPRINGWOODS VILLAGE PARKWAY E2 4A 296 SPRING TX 77389

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huntington, Richard A Houston, US 54 2087
Mittricker, Franklin F Jamul, US 36 1418
Vaezi, Vahid Greer, US 2 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00