Joint structure of steel beam

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9951510
SERIAL NO

15542036

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a joint structure of steel beam structure, a bracket is coupled and fixed to the lateral side of a large beam or a pillar and a steel beam is coupled to the bracket such that the steel beam is coupled to the lateral side of the large beam or the pillar. One end of the bracket is coupled to the lateral side of the large beam or the pillar, and the other end is inclined such that the lower part thereof forms an acute angle, wherein a first attachment plate is coupled to the inclined end part of the bracket such that a fixed length thereof protrudes from the upper end of the bracket. The lower part of one end of the steel beam is inclined at an obtuse angle so as to correspond to the other inclined end of the bracket.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG C & T CORPORATION(SANGIL-DONG)26 SANGIL-RO 6-GIL GANGDONG-GU SEOUL 05288
SEN CORETECH CO LTD6 BEODEUNARU-RO 19-GIL (DANGSAN-DONG SENSE BLDG ) YEONGDEUNGPO-GU SEOUL 07226

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Chang Nam Seoul, KR 7 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00