Control valve filter and control valve insertion structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9950285
SERIAL NO

14561268

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first engagement unit and a second engagement unit are formed to be engaged with each other at a divided portion formed in a substantially ring-shaped frame of a control valve filter. The first engagement unit includes a first inclination surface and a recessed portion. The second engagement unit includes a second inclination surface capable of coming into close contact with the first inclination surface and a projection portion engaged with the recessed portion. The recessed portion and the projection portion are engaged from the diameter direction of the frame, and the first inclination surface and the second inclination surface are in close contact with each other, whereby the first engagement unit and the second engagement unit are engaged with each there, and therefore, the recessed portion and the projection portion can be prevented from being deformed or damaged.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MIKUNI CORPORATION13-11 SOTOKANDA 6-CHOME CHIYODA-KU TOKYO 1010021

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yoshida, Junichi Iwate, JP 105 1896

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00