Loader mounted blower for cleaning chicken houses

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9949462
SERIAL NO

14313333

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blower apparatus is supported on a frame detachably mounted on the implement mounting plate for a skid steer loader. The blower is powered by a hydraulic motor operatively connected to the auxiliary hydraulic system of the skid steer loader. The blower is mounted on the frame in a manner that orients the discharge spout upwardly to be directed at elevated structure within the chicken house. Re-orientation of the air stream from the blower can be affected by manipulating the tilt position of the implement mounting plate and by raising the boom arms of the skid steer loader to elevate the blower apparatus. By properly positioning and orienting the discharged air stream from the blower apparatus, the dirt and debris in elevated structure of the chicken house can be dislodged and removed from the chicken house to improve the health and environment for a subsequent flock of birds installed therein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZIMMERMAN H LAMARMANHEIM PA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zimmerman, H Lamar Manheim, US 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00