Method for producing stator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9948166
SERIAL NO

14610275

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method that can produce a high-performance stator by providing only an upper or lower fixed piece for latching a coil on an insulator and thus effectively suppressing loosening of the coil winding wire when resin is injected while improving the production efficiency of the insulator. The method includes producing an intermediate by disposing a coil around an insulator, which includes a tubular portion, a flange at one end thereof, and a fixed piece that, when the insulator is loosely fit around the tooth, extends in the radial direction of the tooth from an end side of the flange corresponding to an upper or lower end face of the tooth, and has a coil latching claw, and loosely fitting the insulator with the coil around the tooth; and placing the intermediate in a die and injecting resin from around a region where the coil is latched by the fixed piece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kino, Masahiro Toyota, JP 5 24
Tanaka, Masashige Toyota, JP 4 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00