Tripolar VSC-HVDC transmission system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9948104
SERIAL NO

15111216

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tripolar VSC-HVDC system and method include a rectifier and an inverter formed by a three-phase six-bridge arms modular multilevel converter (MMC) respectively, and two converter valves are arranged on the DC side of the rectifier and inverter respectively. The midpoint of upper and lower converter valves of the rectifier and inverter are connected with a pole 3 DC line by a smoothing reactor. Triggering of the upper and lower converter valves is controlled to change the DC voltage polarity of the pole 3 periodically, and tripolar DC transmission is realized by modulating current orders of the three poles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NR ELECTRIC CO LTD211102 NO 69 SU YUAN AVENUE JIANGNING DISTRICT JIANGSU NANJING NANJING CITY JIANGSU PROVINCE 211102
NR ELECTRIC ENGINEERING CO LTDNO 69 SUYUAN AVENUE JIANGNING DISTRICT NANJING JIANGSU 211102

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Ming Jiangsu, CN 311 1411
Jiao, Xinyan Jiangsu, CN 1 3
Lu, Yu Jiangsu, CN 368 9572
Shao, Zhenxia Jiangsu, CN 2 15
Shen, Gang Jiangsu, CN 165 1014
Tian, Jie Jiangsu, CN 85 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00