Titanium material for polymer electrolyte fuel cell separator, method for producing the same, and polymer electrolyte fuel cell using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9947941
SERIAL NO

14349797

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A titanium material for a polymer electrolyte fuel cell separator consists of, by mass %, a platinum group metal: 0.005% to 0.15% and a rare earth metal: 0.002% to 0.10%, with the balance being Ti and impurities. The titanium material of the present invention is provided with a film formed of a titanium oxide and a platinum group metal on the surface thereof. It is preferred that the film has a thickness of 50 nm or less, and that the concentration of the platinum group metal on the surface of the film is 1.5% by mass or more. With the thus formed film, the titanium material of the present invention is capable of achieving a reduction in initial contact resistance and ensuring good corrosion resistance. In the titanium material of the present invention, the rare earth metal is preferably Y, and the platinum group metal is preferably Pd.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL & SUMITOMO METAL CORPORATIONTOKYO 100-8071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaminaka, Hideya Tokyo, JP 26 191
Matsumoto, Satoshi Tokyo, JP 209 1933
Takeuchi, Kouichi Tokyo, JP 28 296
Yoshida, Kentarou Tokyo, JP 15 92

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00