Method for welding metal tab of electrode layer for cable battery and electrode manufactured thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9947913
SERIAL NO

14913887

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a method of welding a metal tab of an electrode layer for a cable battery and an electrode manufactured thereby. This welding method, suitable for welding a metal tab to an electrode including a current collector for a cable battery, a conductive layer formed on the outer surface of the current collector, and a polymer film layer formed on the inner surface of the current collector, includes: a) removing a portion of the conductive layer using a pulse laser, thus exposing the surface of the current collector positioned thereunder, and b) welding a metal tab to the surface of the current collector, thus enabling the welding of a metal tab and an electrode for a cable battery, which has been difficult to achieve using a conventional welding process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ENERGY SOLUTION LTDSEOUL SOUTH KEREAN SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Hyeran Daejeon, KR 2 12
Kim, Taesu Daejeon, KR 63 3039
Lee, Jinsoo Daejeon, KR 23 141
Shin, Bugon Daejeon, KR 4 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00