Torque sensor and electric power steering apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9945742
SERIAL NO

15326646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The torque sensor includes a detection unit for detecting the magnetic transition through a through hole formed so as to penetrate a radial-side surface of the housing; a housing chamber formed to be raised outward in a radial direction from an outer circumferential surface of the housing so that the through hole opens into the housing chamber accommodating the detection unit; a communication hole provided so as to extend in the tangential direction with respect to an outer circumference of the housing, the communication hole making an outside of the housing and an inside of the housing chamber communicate with each other; and an output terminal fitted into the communication hole and connected to the detection unit in a tilting state, the output terminal being configured to output a signal to the outside on the basis of a detected signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYB CORPORATIONWORLD TRADE CENTER BLDG 4-1 HAMAMATSU-CHO 2 CHOME MINATO-KU TOKYO 105-6111 JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamada, Ryota Gifu, JP 206 1189

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00