Control system of excavating machine and excavating machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9945095
APP PUB NO 20160251824A1
SERIAL NO

14386456

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system of an excavating machine controls the excavating machine including a work machine, and includes a communication unit communicating with an outside of the excavating machine and receiving construction information related to an object to be excavated that is excavated by the work machine, a storage unit storing the construction information received by the communication unit, a work machine control unit executing excavation control to control an operation of the work machine not to erode the object to be excavated based on position of the work machine and the construction information stored, and a processing unit determining whether updating construction information to be used by the work machine control unit for the excavation control to the new construction information received by the communication unit according to a control state of the work machine by the work machine control unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOMATSU LTDMINATO-KU TOKYO 107

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arimatsu, Daiki Hiratsuka, JP 15 160
Nomura, Azumi Fujisawa, JP 15 381

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00