Process for transitioning between incompatible catalysts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9944727
SERIAL NO

15537997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for transitioning from a first continuous polymerization reaction in a gas phase reactor conducted in the presence of a first catalyst to a second polymerization reaction conducted in the presence of a second catalyst in the gas phase reactor wherein the first and second catalysts are incompatible, the process comprising: (a) discontinuing the introduction of the first catalyst into the gas phase reactor; (b) introducing an effective amount of cyclohexylamine into the reactor to at least partially deactivate the first catalyst; (c) introducing an organometallic compound into the reactor and reacting the organometallic compound with cyclohexylamine; (d) introducing a gas composition into the reactor for the second polymerization reaction and (e) introducing the second catalyst into the reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SABIC GLOBAL TECHNOLOGIES B VNETHERLANDS GELEEN LIMBURG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Humydi, Abdulaziz Hamad Riyadh, SA 13 28
Banat, Yahya Riyadh, SA 22 39
Fellahi, Said Riyadh, SA 9 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00