Laminates and methods of making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9944043
SERIAL NO

13633450

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An incrementally activated laminate that includes an incrementally activated fibrous web and a film having alternating first and second regions and a laminate of the film and an extensible fibrous web. The first region of the film includes a first polymeric composition, and the second regions include an elastic polymeric composition that is more elastic than the first polymeric composition. In the incrementally activated laminate, the distance between midpoints of two first regions separated by one second region is smaller than the activation pitch, and the first regions are not plastically deformed. In the extensible laminate, a tensile elongation at maximum load of the film is up to 250 percent of the tensile elongation at maximum load of the extensible fibrous web. Methods of making the laminates are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANYP O BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ausen, Ronald W St. Paul, US 115 1904
Hanschen, Thomas P Mendota Heights, US 80 1372
Kopecky, William J Hudson, US 80 725
Rajagopal, Vathsala Woodbury, US 4 77
Sikorski,, Jr William H White Bear Lake, US 8 105
Wallis, Paul S Swansea, GB 2 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00