Method for manufacturing a composite product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9943989
SERIAL NO

14708193

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a composite product includes folding a first layer of material to create a first folded layer having a first and a second superposed portion extending from a respective first and second free end to a first bend, folding a second layer of material in order to create a second folded layer having a third and a fourth superposed portion extending from a respective third and fourth free end to a second bend, laying the first folded layer over a first element with the first portion in contact with the first element, laying the second folded layer over the first folded layer laying a second element over the second folded layer, compressing the plurality of the fiber layers by either vacuum or gravity, pulling two free ends of the first folded layer and of the second folded layer in order to let them contact each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS GAMESA RENEWABLE ENERGY A/SBORUPVEJ 16 BRANDE 7330

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nielsen, Per Vodskov, DK 20 211
Torgard, Sigmund Wenningsted Fredericia, DK 5 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00