Multi-rail switching converter, control circuit and associated control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9941781
SERIAL NO

14970457

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-rail switching converter providing a plurality of output voltages has a master switching circuit, a plurality of slave switching circuits and a control circuit. The control circuit has an interleaving control circuit, the interleaving control circuit judges a phase zone of a corresponding slave switching circuit based on a switching control signal of the master switching circuit and a set signal of the corresponding slave switching circuit, and adjusts a turn-ON moment of the corresponding slave switching circuit based on the phase zone of the corresponding slave switching circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHENGDU MONOLITHIC POWER SYSTEMS CO LTDNO 8 KEXIN ROAD WEST ZONE OF HI-TECH ZONE CHENGDU SICHUAN 611731

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Wangmiao Hangzhou, CN 14 57
Jiang, Lijie Hangzhou, CN 44 353
Lu, Wenbin Hangzhou, CN 24 98
Ouyang, Qian Hangzhou, CN 62 711
Yang, Eric Saratoga, US 81 8860
Zhou, Jinghai San Jose, US 32 555

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00