Terminal, wire harness, and wire-harness structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9941601
SERIAL NO

15088425

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transition portion (4) has a surface (14) that is formed extending upward. The surface (14) is a surface formed extending upward so as to face a bottom portion (6a). Specifically, the transition portion (4) has a cross-sectional shape in which upper edge portions of side portions (8a) are bent inward. As the surface (14) approaches a main terminal body (3) from a sealing portion (22), the surface (14) gradually separates away from the bottom portion (6a) and the edge portions of the surface (14) gradually open outward and connect to side portions (8b) of the main terminal body (3). The surface (14) is formed so as to be curved upward, in a cross-section, from the end portion of the sealing portion (22).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FURUKAWA ELECTRIC CO LTDJAPAN TOKYO CHIYODA TOKYO TOKYO METROPOLIS
FURUKAWA AUTOMOTIVE SYSTEMS INCSHIGA SHIGA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawamura, Yukihiro Inukami-gun, JP 75 581
Kuwahara, Mikio Inukami-gun, JP 93 2283
Terashima, Ryusuke Inukami-gun, JP 4 7
Tonoike, Takashi Inukami-gun, JP 27 182

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00