Rechargeable battery having improved current density

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9941503
SERIAL NO

15002338

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rechargeable battery according to one or more exemplary embodiments includes: a pair of electrode assemblies, each including a first electrode including a coated region, a tab, and a connecting tab, a second electrode including a coated region, a tab, and a connecting tab, and a separator between the first electrode and the second electrode, the first electrode, the separator, and the second electrode being wound; a case accommodating the pair of electrode assemblies; a cap plate at an opening of the case and defining terminal openings; and first and second electrode terminals respectively connected to the tabs of the first and second electrodes and respectively passing through the terminal openings. The pair of electrode assemblies are electrically connected to each other via the connecting tabs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG SDI CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baik, Yun-Ki Yongin-si, KR 1 5
Nam, Jong-Woo Yongin-si, KR 9 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00