Handling a failure in a system with distributed control of power and thermal management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9939867
SERIAL NO

14753965

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus includes a plurality of components and a plurality of component controllers. Each of the plurality of component controllers is associated with at least one component of the plurality of components. Each component controller is configured to compute a local power budget for the at least one component based, at least in part, on the power differential and the proportion of the total power consumption corresponding to the at least one component. A service processor is configured to determine failure associated with at least one component controller of the plurality of component controllers or the at least one component associated with the at least one component controller. The service processor is configured to in response to a reset threshold not being exceeded, reset the at least one component controller without interrupting operations of any components of the at least one component that have not failed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allen-Ware, Malcolm S Austin, US 64 326
Broyles, Martha Ann Austin, US 3 12
Miles, Glenn Rueban Austin, US 5 22
Rosedahl, Todd Jon Zumbrota, US 10 118
Silva, Guillermo Jesus Austin, US 12 125
Still, Gregory Scott Raleigh, US 16 71

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00