Cascading oil distribution system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9939179
SERIAL NO

14962600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refrigeration system includes a plurality of compressors connected in series with each other. Each compressor has an oil sump located in a gravitational bottom of the compressor. A common supply line supplies refrigerant and oil to each of the plurality of compressors. The plurality of compressors includes a lead compressor and one or more non-lead compressors. The common supply line is configured to return more oil to the lead compressor than to the one or more non-lead compressors. Oil sump pressures for the plurality of compressors are maintained such that the lead compressor has the highest oil sump pressure, and the oil sump pressures of the non-lead compressors are successively lower with respect to its position downstream of the lead compressor. As a result, oil is distributed between adjacent compressors from the lead compressor, which is a most upstream compressor, sequentially downstream to the one or more non-lead compressors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BITZER KUEHLMASCHINENBAU GMBHPETER-SCHAUFLER-PLATZ 1 SINDELFINGEN 71065

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fraser, Bruce A Manlius, US 33 390

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00