Dual reheat topping cycle for improved energy efficiency for compressed air energy storage plants with high air storage pressure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9938895
SERIAL NO

14078986

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for operating a compressed air energy storage system is provided. The method can include compressing a process gas with a compressor train to produce a compressed process gas and storing the compressed process gas in a compressed gas storage unit. The method can also include extracting the compressed process gas from the compressed gas storage unit to an expansion assembly through a feed line. A valve assembly fluidly coupled to the feed line can be actuated to control a mass flow of the compressed process gas from the compressed gas storage unit to the expansion assembly. The method can further include heating the compressed process gas in a preheater fluidly coupled to the feed line upstream from the expansion assembly, and generating a power output with the expansion assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY INC4400 ALAFAYA TRAIL ORLANDO FL 32826-2399

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kerth, Jason M Houston, US 14 201
Lucas, George M Wellsville, US 12 93
Rashid, Stephen S Wellsville, US 2 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00