Method of manufacturing fence with elongated tubular members

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9938747
SERIAL NO

14755132

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fence includes first elongated tubular members, each one of which is configured to extend vertically from ends of the first elongated tubular members positionable proximate to a support surface (e.g., the ground). The fence also includes second elongated tubular members extending between the first elongated tubular members, each of which is configured to extend parallel to the support surface. The fence further includes receivers defined by apertures formed in the first elongated tubular members, each of which extends outwardly from respective first elongated tubular members so that each one of the second elongated tubular members can be fixedly attached to corresponding ones of the first elongated tubular members. In some embodiments, one or more of the first elongated tubular members and/or the second elongated tubular members can have a circular cross-section. The second elongated tubular members can be fixedly attached the first elongated tubular members with and/or without welding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEHLEN MFG CO4025 E 23RD ST COLUMBUS NE 68601

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hancock, William H Columbus, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00