Permanent magnet rotating electrical machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9935512
SERIAL NO

14557494

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a permanent magnet rotating electrical machine including a stator, a rotor obtained by stacking a plurality of rotor cores arranged with magnet insertion holes in layers with gaps, and permanent magnets inserted to the magnet insertion holes, the magnet insertion holes are formed on both sides of the duct piece so as to depart from the duct piece disposed between the rotor cores as the magnet insertion holes extend from the side of the center of the rotor core to the outer circumference side, the magnet insertion holes are disposed so as to shift from the duct piece in the circumferential direction of the rotor, and inner circumference side voids having the length in the circumferential direction wider than the thickness in the circumferential direction of the permanent magnets are provided from the inner circumference side ends of the permanent magnets toward the duct piece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI LTDTOKYO JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujigaki, Tetsuo Tokyo, JP 25 234
Hori, Masahiro Tokyo, JP 69 1259
Iiduka, Motonobu Tokyo, JP 5 14
Kimura, Mamoru Tokyo, JP 56 421
Matsumoto, Youichi Tokyo, JP 21 261

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00