Projector and control method thereof using rotation information for a phosphor disc

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9933694
SERIAL NO

15049664

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A projector is provided which can secure long-term reliability and enable high-speed start-up through suppression of local heat generation of phosphor. The projector includes a light source device including an excitation light source emitting excitation light, a phosphor disk on which a phosphor that converts the excitation light into fluorescence is continuously formed in a circumferential direction of the phosphor disk, a motor unit rotating the phosphor disk in the circumferential direction, a light modulation device generating an image light through modulation of light including the fluorescence, and a projection optical system projecting the image light. If the number of rotations of the phosphor disk reaches a predetermined number that is smaller than a target number, the excitation light source is turned on, while if the number of rotations of the phosphor disk is increased after reaching the predetermined number, an output of the excitation light source is increased.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEIKO EPSON CORPORATION1-6 SHINJUKU 4-CHOME SHINJUKU-KU TOKYO 1608801 ?1608801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Toyooka, Takashi Matsumoto, JP 100 1118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00