Screwless eyeglass frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9933630
SERIAL NO

15139116

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A screwless eyeglass frame, including a rim support, a temple support and a pivoting clip. The rim support includes a first end face and an engagement slot recessed inwardly from the first end face. The temple support includes a second end face, two extending walls extended outwardly from two corresponding sides of the second end face, respectively, and a shaft rod provided between the two extending walls. The pivoting clip includes a C-shaped buckle with resilience, two connecting legs connected with two ends of the C-shaped buckle, respectively, and an opening located between the two connecting legs. In this case, the C-shaped buckle is allowed for pivotally connecting to the shaft rod. The two connecting legs are tenoned into the engagement slot, and the temple support is capable of rotating with respect to the rim support around the shaft rod and the C-shaped buckle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LAI YING LINGNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lai, Ying-Ling Tainan, TW 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00