Piezoelectric material, piezoelectric element, and electronic equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9932273
SERIAL NO

14764121

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a lead- and potassium-free piezoelectric material having a high piezoelectric constant and a satisfactory insulation property and a piezoelectric element that includes the piezoelectric material. The piezoelectric material contains a perovskite-type metal oxide having the general formula (1): (NaxBa1-y)(NbyTi1-y)O3 (wherein x satisfies 0.80≤x≤0.95, and y satisfies 0.85≤y≤0.95); and at least one rare-earth element selected from La, Pr, Nd, Pm, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, and Lu, wherein the rare-earth element content is more than 0 mol % and 5 mol % or less of the amount of perovskite-type metal oxide. The piezoelectric element includes the piezoelectric material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHATOKYO JAPAN DAEJEON 3 MEATBALLS 30 2 TOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayashi, Jumpei Yokohama, JP 65 394
Murakami, Shunsuke Kawasaki, JP 76 327
Ueda, Miki Tokyo, JP 45 244
Watanabe, Takayuki Yokohama, JP 316 3383

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00