A thermal power plant has an exhaust gas system, a feed-water system, a high-pressure feed-water heater provided to the feed-water system, a main economizer, a catalytic NOx removal equipment, and a sub economizer. The main economizer is provided to the secondary side of the high-pressure feed-water heater of the feed-water system and increases the temperature of the feed-water by using the residual heat of the combustion gas from the boiler. The catalytic NOx removal equipment is provided to the secondary side of the main economizer of the exhaust gas system. The exhaust gas is supplied to the catalytic NOx removal equipment at a required temperature or higher. The sub economizer is provided between the high-pressure feed-water heater and the main economizer and increases the temperature of water by using the exhaust gas on the secondary side of the NOx removal equipment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRIC POWER DEVELOPMENT CO LTD15-1 GINZA 6-CHOME CHUO-KU TOKYO 104-8165

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagano, Shiro Tokyo, JP 1 3
Suzuki, Shinsuke Tokyo, JP 43 673

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00