Work vehicle and work vehicle emergency travelling method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9926686
SERIAL NO

14905377

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gear mechanism of a power train includes first and second planetary gear mechanisms, which respectively include first to third rotating elements and fourth to sixth rotating elements which are each different to each other. The transmission section transfers the drive force of the second rotating element to the fourth rotating element. A rotating shaft fixing section of a power train integrally operates the rotating shafts of the third and fifth rotating elements. A variable transmission section of a power train includes an input section where drive force is input and an output section configured to output drive force equal to or less than the input drive force. A drive force conversion control section of a controller controls the variable transmission section to enable the output of the engine to be converted to an appropriate drive force and the converted drive force to be transferred to the output shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOMATSU LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kishimoto, Yasuki Hiratsuka, JP 9 112
Miyamoto, Shunsuke Atsugi, JP 37 315
Monden, Hiroshi Hiratsuka, JP 25 180
Ohkura, Yasunori Kawasaki, JP 19 239

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00