Process for producing coenzyme Q10

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9926580
SERIAL NO

15076025

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing on an industrial scale the oxidized coenzyme Q10, includes culturing a reduced coenzyme Q10-producing microorganism selected from the group consisting of the genus Rhodobacter, the genus Saitoella, the genus Schizosaccharomyces and the genus Trichosporon, to obtain microbial cells containing reduced coenzyme Q10 at a ratio of not less than 70 mole % among the entire coenzymes Q10; and one of: (a) oxidizing thus-obtained reduced coenzyme Q10 to oxidized coenzyme Q10 and then extracting the oxidized coenzyme Q10 by an organic solvent; or (b) extracting reduced coenzyme Q10 by an organic solvent and oxidizing the extracted reduced coenzyme Q10 to oxidized coenzyme Q10.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KANEKA CORPORATIONOSAKA JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanda, Akihisa Osaka, JP 10 43
Kato, Takahisa Hyogo, JP 143 1252
Kitamura, Shiro Hyogo, JP 64 544
Ueda, Yasuyoshi Hyogo, JP 103 603
Yajima, Kazuyoshi Hyogo, JP 25 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00