Pre-charge quick key cycling protection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9925933
SERIAL NO

14015180

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle is disclosed comprising a pre-charge circuit, including a resistor, that selectively connects a traction battery to an electrical impedance. A controller is programmed to inhibit pre-charging for an amount of time when a predetermined number of pre-charge cycles have occurred within a preceding predetermined period of time. The predetermined number of pre-charge cycles may be based on a voltage or current magnitude across the resistor during the previous pre-charge cycles. The predetermined number of times may be modified based on prior successful and failed pre-charge cycles. A method of limiting a temperature increase of a pre-charge resistor is disclosed comprising counting a number of prior pre-charge cycles and inhibiting pre-charging when the number of prior pre-charge cycles within the preceding period of time exceeds a threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLC1 AMERICAN ROAD FL4 DEARBORN MI 48126

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hartl, Derek Royal Oak, US 40 1034
Vander, Laan Kevin Bloomfield Hills, US 12 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00