Forming process for hot forming a steel sheet of a rotor blade to be produced for a wind energy plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9925626
APP PUB NO 20150290752A1
SERIAL NO

14236786

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention concerns a forming process for hot forming of a steel sheet of a rotor blade to be produced of a wind power installation, including the steps heating the steel sheet in a furnace while the steel sheet is lying on a hearth bogie, displacing the heated steel sheet with the hearth bogie from the furnace into a pressing apparatus for the hot forming operation, transloading the heated steel sheet in the pressing apparatus from the hearth bogie on to a form bogie having a counterpart form, and pressing the steel sheet by at least one pressing punch which presses on the steel sheet in such a way that it is formed between the pressing punch and the counterpart form and in particular assumes the shape of the pressing punch and the counterpart form.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WOBBEN PROPERTIES GMBH26607 AURICH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kersten, Roy Hohenwarthe, DE 13 28
Labs, Oliver Magdeburg, DE 1 3
Voigt, Burkhard Magdeburg, DE 3 118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00